Contract consisted of the construction of a new 5500 square foot structure and installation of an Existing SPRUNG frame-supported membrane roof system to serve as a salt storage building.
Continue Reading...
NOAA Design/Build Renovation of Maintenance Shop included complete demolition of all interior walls and demolition of all exterior metal sheet panels to expose existing metal building structure.
Continue Reading...
Timber Bridge Conversion Work included the demolition of the existing railroad rails and deck planking on the TA-28 Timber Bridge at Fort Eustis.
Continue Reading...
Contract consisted of the demolition of the remains of the existing Temperanceville, VA salt storage building, and the construction of a new 3500 square foot structure to serve the same purpose. Demolition included existing foundation and asphalt pavement.
Continue Reading...
This subcontract involved the replacement of existing platform grating and handrails on the V-24 Tower on Wallops Island Flight Facility with new FRP (Fiber Reinforced Plastic) material. Work entailed working at heights, and required R.H. Contracting to provide an approved Fall Prevention Plan, full fall-arrest harness systems, and an onsite Competent Person.
Continue Reading...