Temperanceville AHQ Chemical Storage Building (VDOT)

Contract consisted of the demolition of the remains of the existing Temperanceville, VA salt storage building, and the construction of a new 3500 square foot structure to serve the same purpose. Demolition included existing foundation and asphalt pavement.

Construction included excavation, foundations, 12’ high cast in place concrete walls, rebar installation, steel erection, waterproofing, installation of fabric roof system, electrical installation, relocation of existing water lines, site work, landscaping, and asphalt pavement.

R.H. Contracting, Inc. self-perform all the work with exception of asphalt paving and electrical. The Project was completed on March 2013.

  • Temperanceville AHQ Chemical Storage Building
  • VDOT Project 501-16369-039
  • R.H. Contracting, Inc. (Prime)
  • Contractor: $265,362.69

Some Images of the Temperanceville Chemical Storage Building Project

SWM Logo
Logo

General Contracting

general contracting services

Environmental

environmental services

Residential

residential services